logo
Bienvenido a NEW-ERA STEEL TUBE TECHNOLOGY CO.,LTD
Found 287 products for "

cold rolled pipe

"
Calidad Tubo de la ronda del acero inoxidable de ASTM A213 TP304 fábrica

Tubo de la ronda del acero inoxidable de ASTM A213 TP304

Polished SS304 stainless steel tubing 304 stainless steel pipes Material Stainless Steel 304/304L/316L Shape Round / Square / Rectangle Production Standards ASTM A270, ASTM A269, ASTM A249, ASTM A778, ASTM A789, DIN 11850, EN 10357, EN 10217-7 and so on. Outer Diameter 6mm - 168mm ; Thickness 0.8mm - 20 mm ; Length 6 Meters - 18.3 Meters ; As customers' request ; Tolerance According to the Standard , +/-10% Commonly ; Surface Treatment 180#, 320#, 400# Satin / Hairline,

Calidad Tubería de acero retirada a frío del negro de Erw, tubería de acero estructural de SKTM11A/de SKTM12A fábrica

Tubería de acero retirada a frío del negro de Erw, tubería de acero estructural de SKTM11A/de SKTM12A

Product Name: SKTM11A SKTM12A SKTM13A Seamless Cold Drawn Steel Tube JIS G3445 for Structural Purposes Material: STKM11A, STKM12(ABC), STKM13(ABC) Size Range: OD: 6-88mm, WT: 1-15mm, Length: 5.8m/6m, maximal 11.8m Quality Control: 1. Incoming Raw Material Inspection 2. Raw Material Segregation to avoid steel grade mix-up 3. Heating and Hammering End for Cold Drawing 4. Cold Drawing or Cold Rolling, On line inspection 5. Heat Treatment:BKS, GBK, NBK 6. Straightening/Cutting to

Calidad Casquillo plástico del tubo de EN10305-4 Dom Seamless Cold Drawn Tubes alrededor de la forma fábrica

Casquillo plástico del tubo de EN10305-4 Dom Seamless Cold Drawn Tubes alrededor de la forma

Products Description: EN10305-4 Seamless Cold Drawn Tubing DOM Steel Pipe for Hydraulic and Pneumatic Power Systems Steel Grade/Steel Material: Chemical composition(cast analysis)a Steel Grade % by mass Name Number C max Si max Mn max P max S max Altot min E215 1.0212 0.10 0.05 0.70 0.025 0.015 0.025 E235 1.0308 0.17 0.35 1.20 0.025 0.015 - E355b 1.0580 0.22 0.55 1.60 0.025 0.015 - a Elements not included in this table (but see footnote b) shall not be intentionally added to

Calidad Tubo de acero de la sección hueco retirada a frío precisión del diámetro externo de 6 - de 76m m alta fábrica

Tubo de acero de la sección hueco retirada a frío precisión del diámetro externo de 6 - de 76m m alta

JIS G3445 STKM11A STKM12C STKM13C outer round inner oval shapped steel tubes for auto rubber bushing Seamless Carbon and Alloy Steel Mechanical Tubing Applications: For auto rubber bushing Size range: O.D.:6-76mm W.T.:1-15mm L:max12000mm Steel Grade JIS G3445 STKM11A,12C,13C or others,Chemical compisition: Mechanical properties: JIS3445 C Si Mn P S Nb or V Tention Test Flateniug Bendability Symbol T.S. N/mm^2 Y.P. N/mm^2 Elongation No 4,11,12 Test pe No 4,5 Test pe Distance

Calidad Tubo de acero exhausto del sólido automotriz del freno E215 fábrica

Tubo de acero exhausto del sólido automotriz del freno E215

Product Name: E215 1.0212+C 08AL according DIN EN10305-1 Precision Seamless cold drawn steel tube For automotive machining parts Material: E215 E235,E355 Size Range: OD: 6-88mm, WT: 1-15mm, Length: 5.8m/6m, maximal 11.8m Delivery Condition: +C, +LC, +SR, +A, +N Application: For high precision purpose, auto brake tube, like manipulator, Shock Absorber, Transmission Shaft, Steering Gear, Car Frame, etc. Stable Quality with Comeptitive Price. +N(Bright Annealing) Heat Treatment,

Calidad Tubo inconsútil de la aleación del carbono medio, tubería de acero estructural de ASTM A210 para los sobrecalentadores fábrica

Tubo inconsútil de la aleación del carbono medio, tubería de acero estructural de ASTM A210 para los sobrecalentadores

Prdouct Name: ASTM A210 Seamless Medium Carbon Steel Boiler Tube for SuperheatersMaterial: A-1, CApplication: For High pressure boilerSize(mm): O. D.: 10-156mm W. T.: 1-20mm L: Max 12000mm Quality Control:1. Incoming Raw Material Inspection2. Raw Material Segregation to avoid steel grade mix-up3. Heating and Hammering End for Cold Drawing4. Cold Drawing or Cold Rolling, On line inspection5. Heat Treatment6. Straightening/Cutting to specified length/Finished Measuring

Calidad carbono inconsútil ASTM de acero A519 del tubo de acero de la precisión 1045 4130 4140 fábrica

carbono inconsútil ASTM de acero A519 del tubo de acero de la precisión 1045 4130 4140

SAE1045/45# Precision Cold Drawn Seamless Carbon Steel Round Mechanical Tubing Products Description Material:1045 4130 4140 etc Size: OD: 1mm~50mm WT: 6mm~350mm Length: 12m max Technique: Cold Draw/Cold Rolled Surface: Anti Rust Oil End protector: Plastic Pipe Cap Tolerance: It can be controled within OD/Thickness +/-0.1mm Application: Auto Parts, Machinery Parts Test: Tension Test, Flaring Test, Flange Test, Reverse Test, Hardness Test, Hydrostatic or Nondestructive Electric

Calidad Material de acero St52 Bk de la tubería del tubo de los Cdes inconsútiles de la precisión fábrica

Material de acero St52 Bk de la tubería del tubo de los Cdes inconsútiles de la precisión

Seamless Precision Tubing DIN2391 St35/St45/St52 BK Cold Worked Steel Tubing with precision usage O.D. Size: 6-256mm, W.T. Size: 1-30mm, Length: 5.8m/6m Fixed Length, or maximal 11.8m Random Length Delivery Condition: BK, BKW, BKS, GBK, NBK Application: For Precision usages. Super straight Pipes, Straightness: 1/1000mm Smooth and Clean Inside pipe surface Steel Grade Chemical Composition Symbol Material Number C Max. Si Max. Mn P Max. S Max. ST35 1.0308 0.17 0.35 ≥0.40 0.025

Calidad Tubería hidráulica de acero del cilindro, tubo de acero de la pared pesada de la precisión del estruendo 2391 St35 BK fábrica

Tubería hidráulica de acero del cilindro, tubo de acero de la pared pesada de la precisión del estruendo 2391 St35 BK

Product Name: DIN2391 St35 BK Precision Cold Drawn Seamless Steel Tube for Hydraulic CylinderMaterial: ST35, ST45, ST52Size Range: OD: 6-88mm, WT: 1-15mm, Length: 5.8m/6m, maximal 11.8mDelivery Condition: 1. BK (+C) No heat treatment after last cold forming process.2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing)3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed.4. GBK (+A) After the final cold forming